Princeton Digital Group JC3 Campus (GIIC Bekasi)
Princeton Digital Group JC3 Campus (GIIC Bekasi) is a data center under construction in Bekasi, Indonesia, operated by Princeton Digital Group. The announced capacity at full build-out is 120 MW. The site is built for AI workloads.
Facts
| Operator | Princeton Digital Group |
|---|---|
| Status | Under construction |
| Address | Greenland International Industrial Center (GIIC), Cikarang, Bekasi 17530 |
| Location | Bekasi, Indonesia |
| Power capacity | 120 MW |
| Investment | US$1 billion |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- MettaDC ID01 (0.0 km, PT. Mettadc Teknologi Indonesia)
- Digital Edge CGK Campus (GIIC Bekasi) (0.0 km, Digital Edge)
- INFOTAMA HEXA BUILDING (4.5 km, PT. Infotama Lintas Global)
- Biznet BigPOP Bekasi Jatimulya (5.3 km, Biznet Networks)
- NTT Jakarta 3 Data Center (JKT3) (10 km, NTT DATA's Global Data Centers division)
More Princeton Digital Group data centers
- Princeton Digital Group Batam Campus (BT1) Batam
- Princeton Digital Group JC2 Cibitung Cibitung
- JC1 Jakarta, Cibitung
- JB1 Bintaro
- BD1 Bandung
- SB1 Surabaya
- JC2 Jakarta, Cibitung
- Princeton Digital JC3 Indonesia
- Princeton Digital Group JH2 Eco Business Park Senai
- Princeton Digital Group MU1 Airoli Campus Navi Mumbai
- Princeton Digital Group JH1 Sedenak Kulai
- Princeton Digital Group MU2 Navi Mumbai Navi Mumbai