Princeton Digital Group Batam Campus (BT1)
Princeton Digital Group Batam Campus (BT1) is a data center under construction in Batam, Indonesia, operated by Princeton Digital Group. The announced capacity at full build-out is 96 MW.
Facts
| Operator | Princeton Digital Group |
|---|---|
| Status | Under construction |
| Address | Nongsa Digital Park, Batam |
| Location | Batam, Indonesia |
| Power capacity | 96 MW |
| Position accuracy | street level |
Nearby data centers
- DayOne Nongsa Digital Park (Batam) (0.0 km, DayOne)
- Golden Digital Gateway (Gaw Capital / Sinar Primera) (0.0 km, Gaw Capital and Sinar Primera)
- Racks Central Batam Campus (0.0 km, Racks Central)
- Pusat Data Nasional 2 Batam (3.5 km, Government of Indonesia)
- Matrix Data Center BM1 (MDC BM1) (5.2 km, PT. NAP Info Lintas Nusa)
More Princeton Digital Group data centers
- Princeton Digital Group JC3 Campus (GIIC Bekasi) Bekasi
- Princeton Digital Group JC2 Cibitung Cibitung
- JC1 Jakarta, Cibitung
- JB1 Bintaro
- BD1 Bandung
- SB1 Surabaya
- JC2 Jakarta, Cibitung
- Princeton Digital JC3 Indonesia
- Princeton Digital Group JH2 Eco Business Park Senai
- Princeton Digital Group MU1 Airoli Campus Navi Mumbai
- Princeton Digital Group JH1 Sedenak Kulai
- Princeton Digital Group MU2 Navi Mumbai Navi Mumbai