Digital Edge CGK Campus (GIIC Bekasi)
Digital Edge CGK Campus (GIIC Bekasi) is a data center under construction in Bekasi, Indonesia, operated by Digital Edge. The announced capacity at full build-out is 500 MW. The site is built for AI workloads.
Facts
| Operator | Digital Edge |
|---|---|
| Status | Under construction |
| Address | GIIC Industrial Estate, Cikarang, Bekasi, West Java |
| Location | Bekasi, Indonesia |
| Power capacity | 500 MW |
| Expected | 2026 |
| Investment | US$4.5 billion |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- MettaDC ID01 (0.0 km, PT. Mettadc Teknologi Indonesia)
- Princeton Digital Group JC3 Campus (GIIC Bekasi) (0.0 km, Princeton Digital Group)
- INFOTAMA HEXA BUILDING (4.5 km, PT. Infotama Lintas Global)
- Biznet BigPOP Bekasi Jatimulya (5.3 km, Biznet Networks)
- NTT Jakarta 3 Data Center (JKT3) (10 km, NTT DATA's Global Data Centers division)
More Digital Edge data centers
- Digital Edge Navi Mumbai Campus (BOM1, BOM2, BOM3) Navi Mumbai
- Digital Edge SEL5 Ansan Ansan
- Digital Edge NARRA1 (MNL1) Binan
- Digital Edge Johor Campus Kota Tinggi