Stack Infrastructure JHB01 Campus
Stack Infrastructure JHB01 Campus is a data center under construction in Iskandar Puteri, Malaysia, operated by STACK Infrastructure. The announced capacity at full build-out is 220 MW. The site is built for AI workloads.
Facts
| Operator | STACK Infrastructure |
|---|---|
| Status | Under construction |
| Address | Data center park, Iskandar Puteri, Johor Bahru |
| Location | Iskandar Puteri, Malaysia |
| Power capacity | 220 MW |
| Expected | 2026 |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- AirTrunk JHB1 (0.0 km, AirTrunk)
- AirTrunk JHB2 to JHB4 Iskandar Puteri (0.0 km, AirTrunk)
- Empyrion Digital Nusajaya Campus MY1 (0.3 km, Empyrion Digital)
- DayOne Nusajaya (Johor) (0.5 km, DayOne)
- STTGDC JHB1 (1.0 km, STTGDC)
More STACK Infrastructure data centers
- STACK Berry Hill Megasite (Project Crossroads) Pittsylvania County
- Stack Stafford Technology Campus Stafford
- STACK Infrastructure NVA02 Manassas
- STACK Sydney SYD01 Erskine Park Erskine Park
- STACK Infrastructure Manassas Campus (NVA02) Manassas
- STACK Alliance campus (former T5@Alliance) Fort Worth
- STACK PHX01 Campus Avondale
- STACK DFW02 South Dallas campus (Lancaster) Lancaster
- STACK Melbourne MEL01 Truganina Truganina
- Stack Infrastructure Loudoun County Campus (144MW) Ashburn
- Stack SVY01 Silicon Valley Campus San Jose
- STACK OSL04 Holtskogen campus Holtskogen