Stack Infrastructure Loudoun County Campus (144MW)
Stack Infrastructure Loudoun County Campus (144MW) is a planned data center in Ashburn, Virginia, United States, operated by STACK Infrastructure. The announced capacity at full build-out is 144 MW. The site is built for AI workloads.
Facts
| Operator | STACK Infrastructure |
|---|---|
| Status | Planned |
| Address | Evergreen Mills Rd area near Dulles Airport, Loudoun County, VA (Baxtel listing) |
| Location | Ashburn, Virginia, United States |
| Power capacity | 144 MW |
| Expected | 2027 |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Vantage Ashburn VA1 Campus (0.0 km, Vantage Data Centers)
- Digital Realty Ashburn Campus (Digital Loudoun) (0.0 km, Digital Realty)
- QTS Ashburn Campus (0.0 km, QTS)
- EdgeCore Ashburn Campus (Maries Road and Moran Road) (0.0 km, EdgeCore)
- Cologix Ashburn Campus and Beaumeade Circle Expansion (0.0 km, Cologix)
More STACK Infrastructure data centers
- STACK Berry Hill Megasite (Project Crossroads) Pittsylvania County
- Stack Stafford Technology Campus Stafford
- STACK Infrastructure NVA02 Manassas
- STACK Infrastructure Manassas Campus (NVA02) Manassas
- STACK Alliance campus (former T5@Alliance) Fort Worth
- STACK PHX01 Campus Avondale
- STACK DFW02 South Dallas campus (Lancaster) Lancaster
- Stack SVY01 Silicon Valley Campus San Jose
- Stack SVY03 Hayward Hayward
- Stack Infrastructure Alpharetta Campus (ATL01) Alpharetta
- Stack Infrastructure Portland PORO2 Hillsboro
- Stack Infrastructure Chicago Campus (CHI01) Elk Grove Village
All data centers in United States