EdgeConneX Greater Osaka Campus (Kagoya Tatara Campus, Kyotanabe)
EdgeConneX Greater Osaka Campus (Kagoya Tatara Campus, Kyotanabe) is a data center under construction in Kyotanabe, Japan, operated by EdgeConneX. The announced capacity at full build-out is 200 MW. The site is built for AI workloads.
Facts
| Operator | EdgeConneX |
|---|---|
| Status | Under construction |
| Address | Kagoya Tatara Campus, Kyotanabe City, Kyoto Prefecture |
| Location | Kyotanabe, Japan |
| Power capacity | 200 MW |
| Expected | 2028 |
| Floor area | 130,000 m² |
| AI focus | yes |
| Also known as | Kagoya Tatara Campus |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- KAGOYA データセンター A棟 (7.5 km, カゴヤ・ジャパン株式会社)
- Colt DCS Osaka Keihanna (7.5 km, Colt Data Centre Services)
- ESR and STACK Keihanna Campus (STACK KIX01) (7.9 km, STACK Infrastructure)
- 京阪奈データセンター (8.1 km)
- NTT DATA Keihanna OSK11 (8.2 km, NTT DATA)
More EdgeConneX data centers
- EdgeConneX Skellefteå Campus Skellefteå
- EdgeConneX New Albany Campus New Albany
- EdgeConneX Atlanta Campus (ATL11 to ATL13) Union City (Fulton County)
- EdgeConneX Mesa Campus (PHX11) Mesa
- EdgeConneX Cedar Creek campus (AUS) Cedar Creek
- EdgeConneX Warsaw 3 (WAW03) and Digital Ursus WAW04 Warsaw
- EdgeConneX Santiago Campus (SCL01 to SCL04) Colina
- EdgeConneX Dublin Hapenny Bridge Campus Clondalkin
- EdgeConneX Warsaw 2 (WAW02) Warsaw
- EdgeConneX Bogotá (BOG01 and BOG11) Bogotá
- EdgeConneX Denver Campus (DEN01 and DEN02) Englewood
- EdgeConneX Brussels campus (BRU01) Ternat