EdgeConneX Bogotá (BOG01 and BOG11)
EdgeConneX Bogotá (BOG01 and BOG11) is a data center under construction in Bogotá, Colombia, operated by EdgeConneX. The announced capacity at full build-out is 28 MW.
Facts
| Operator | EdgeConneX |
|---|---|
| Status | Under construction |
| Location | Bogotá, Colombia |
| Power capacity | 28 MW |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Internexa Bogota World Business Port (0.0 km, InterNexa)
- NAP Colombia (0.0 km, NAP Colombia)
- Ascenty Bogotá campus (BOG1 and BOG2) (0.0 km, Ascenty)
- Equinix Bogotá (BG1 and BG2) (0.0 km, Equinix)
- Claro Triara Bogotá (0.0 km, Claro (America Movil))
More EdgeConneX data centers
- EdgeConneX Skellefteå Campus Skellefteå
- EdgeConneX New Albany Campus New Albany
- EdgeConneX Atlanta Campus (ATL11 to ATL13) Union City (Fulton County)
- EdgeConneX Greater Osaka Campus (Kagoya Tatara Campus, Kyotanabe) Kyotanabe
- EdgeConneX Mesa Campus (PHX11) Mesa
- EdgeConneX Cedar Creek campus (AUS) Cedar Creek
- EdgeConneX Warsaw 3 (WAW03) and Digital Ursus WAW04 Warsaw
- EdgeConneX Santiago Campus (SCL01 to SCL04) Colina
- EdgeConneX Dublin Hapenny Bridge Campus Clondalkin
- EdgeConneX Warsaw 2 (WAW02) Warsaw
- EdgeConneX Denver Campus (DEN01 and DEN02) Englewood
- EdgeConneX Brussels campus (BRU01) Ternat