DC BLOX North Augusta Hyper Edge Data Center
DC BLOX North Augusta Hyper Edge Data Center is a planned data center in North Augusta, South Carolina, United States, operated by DC BLOX. The announced capacity at full build-out is 5 MW.
Facts
| Operator | DC BLOX |
|---|---|
| Status | Planned |
| Location | North Augusta, South Carolina, United States |
| Power capacity | 5 MW |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- QTS Augusta Campus (2.6 km, QTS)
- Columbia County Community Broadband Utility (16 km, Columbia County Community Broadband Utility)
- Meta Aiken Data Center (Sage Mill) (17 km, Meta)
- Clop Aiken Data Center (Sage Mill) (17 km)
- T5@Augusta (18 km, T5 Data Centers)
More DC BLOX data centers
- DC Blox Atlanta West Campus (ATL1) Lithia Springs (Douglas County)
- DC BLOX Nashville Grassmere Park campus Nashville
- DC BLOX Camp Hall (Charleston North) Ridgeville
- DC BLOX Montgomery MGM1 Hope Hull
- DC BLOX Myrtle Beach Cable Landing Station (MYR1) Myrtle Beach
- DC BLOX High Point Data Center High Point
- DC BLOX Huntsville HSV1 Huntsville
- DC BLOX Palm Coast Cable Landing Station Campus Palm Coast
- DC BLOX Thunderbird Indianapolis Campus Indianapolis
- DC BLOX Birmingham BHM1 Birmingham
All data centers in United States