DC BLOX Nashville Grassmere Park campus
DC BLOX Nashville Grassmere Park campus is a planned data center in Nashville, Tennessee, United States, operated by DC BLOX. The announced capacity at full build-out is 50 MW.
Facts
| Operator | DC BLOX |
|---|---|
| Status | Planned |
| Address | 648 and 650 Grassmere Park Drive, Nashville, TN |
| Location | Nashville, Tennessee, United States |
| Power capacity | 50 MW |
| Expected | 2028 |
| Position accuracy | street level |
Nearby data centers
- Level(3) Nashville (Sidco Drive) (3.8 km, Lumen Technologies Inc)
- Peace Communications NSH2 (7.6 km, Peace Communications (Formerly Nexus Group))
- EdgeConneX Nashville (EDCNAS01) (9.1 km, EdgeConneX Inc.)
- Zayo Nashville - 209 10th Ave. S (10 km, Zayo Group)
- XO Nashville (10 km, XO)
More DC BLOX data centers
- DC Blox Atlanta West Campus (ATL1) Lithia Springs (Douglas County)
- DC BLOX Camp Hall (Charleston North) Ridgeville
- DC BLOX Montgomery MGM1 Hope Hull
- DC BLOX Myrtle Beach Cable Landing Station (MYR1) Myrtle Beach
- DC BLOX High Point Data Center High Point
- DC BLOX Huntsville HSV1 Huntsville
- DC BLOX Palm Coast Cable Landing Station Campus Palm Coast
- DC BLOX Thunderbird Indianapolis Campus Indianapolis
- DC BLOX Birmingham BHM1 Birmingham
- DC BLOX North Augusta Hyper Edge Data Center North Augusta
All data centers in United States