Applied Digital Delta Forge 1
Applied Digital Delta Forge 1 is a data center under construction in Boyce, Louisiana, United States, operated by Applied Digital. The announced capacity at full build-out is 300 MW. The site is built for AI workloads.
Facts
| Operator | Applied Digital |
|---|---|
| Status | Under construction |
| Address | Boyce, Rapides Parish, LA (about 300 acres, no street address published) |
| Location | Boyce, Louisiana, United States |
| Power capacity | 300 MW |
| Expected | 2027 |
| Investment | US$3.6 billion |
| AI focus | yes |
| Also known as | Delta Forge One, AI Factory |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- ONE Nuclear Project Cayman (RiverPlex MegaPark) (86 km, ONE Nuclear Energy)
- Hut 8 River Bend Campus (141 km, Hut 8)
- Meta Hyperion (142 km, Meta)
- Meta Hyperion Data Center (Richland Parish) (155 km, Meta)
- DartPoints SHV01 Shreveport (161 km, DartPoints)
More Applied Digital data centers
- Applied Digital Polaris Forge 1 (Ellendale) Ellendale
- Applied Digital Polaris Forge 3 (Oliver County) Center
- Applied Digital Polaris Forge 2 (Harwood) Harwood
- Applied Digital Delta Forge 2 Brookwood
- Applied Digital Adair Data Center Adair
- Applied Digital Jamestown (JMS01) Jamestown
- Applied Digital Elko AI Campus Elko
- ELN02 Ellendale
All data centers in United States