Applied Digital Adair Data Center
Applied Digital Adair Data Center is a planned data center in Adair, Iowa, United States, operated by Applied Digital. The announced capacity at full build-out is 200 MW.
Facts
| Operator | Applied Digital |
|---|---|
| Status | Planned |
| Address | Southeast of Adair near a NextEra substation, Adair County, IA |
| Location | Adair, Iowa, United States |
| Power capacity | 200 MW |
| Floor area | 810,000 m² |
| Position accuracy | region level (approximate) |
Position accuracy: region level (approximate)
Nearby data centers
- Microsoft Van Meter Data Center (51 km, Microsoft)
- COPT Van Meter Campus (51 km, COPT)
- Apple (58 km, Apple)
- Apple Waukee Data Center (Project Morgan) (61 km, Apple)
- Microsoft Project Ginger West (61 km, Microsoft)
More Applied Digital data centers
- Applied Digital Polaris Forge 1 (Ellendale) Ellendale
- Applied Digital Delta Forge 1 Boyce
- Applied Digital Polaris Forge 3 (Oliver County) Center
- Applied Digital Polaris Forge 2 (Harwood) Harwood
- Applied Digital Delta Forge 2 Brookwood
- Applied Digital Jamestown (JMS01) Jamestown
- Applied Digital Elko AI Campus Elko
- ELN02 Ellendale
All data centers in United States