Map › United Kingdom › Vantage Bridgend Campus (former Ford engine plant)
Vantage Bridgend Campus (former Ford engine plant)
Vantage Bridgend Campus (former Ford engine plant) is a data center under construction in Bridgend, United Kingdom, operated by Vantage Data Centers. The announced capacity at full build-out is 148 MW. The site is built for AI workloads.
Facts
| Operator | Vantage Data Centers |
|---|---|
| Status | Under construction |
| Address | Former Ford Bridgend Engine Plant, Waterton, Bridgend |
| Location | Bridgend, United Kingdom |
| Power capacity | 148 MW |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- CGI Datacenter (1.5 km, CGI)
- Vantage Bro Tathan Campus (14 km, Vantage Data Centers)
- BT Empire Exchange / Stadium House (28 km, BT Empire Exchange / Stadium House)
- LINX Wales - BT Stadium House (28 km, LINX)
- Keppel Cardiff Data Centre (28 km, Keppel DC REIT)
More Vantage Data Centers data centers
- Vantage Newport Campus (CWL1) Newport
- Vantage Data Centers LHR1 Greater London
- Vantage Bro Tathan Campus St Athan
- Vantage Frontier (Stargate Shackelford County) Shackelford County near Albany and Abilene
- Vantage Lighthouse Campus (Stargate Port Washington) Port Washington
- Vantage OH2 Millersport Campus Millersport
- Vantage Project Latigo Cheyenne
- Vantage Trident Campus (CO21 and CO22) Aurora
- Vantage JHB1 Sedenak Tech Park Campus (ex Yondr Johor) Kulai
- Vantage NV1 Reno Campus Tahoe Reno Industrial Center, Storey County
- Vantage Ashburn VA1 Campus Ashburn
- Vantage OH1 New Albany Campus New Albany
All data centers in United Kingdom