Travagliato 120 MW data center (Edge Gate)
Travagliato 120 MW data center (Edge Gate) is a cancelled data center project in Travagliato, Italy, operated by Edge Gate with The Blossom Avenue Partners. The stated power capacity is 120 MW.
Facts
| Operator | Edge Gate with The Blossom Avenue Partners |
|---|---|
| Status | Cancelled |
| Address | Travagliato (BS) |
| Location | Travagliato, Italy |
| Power capacity | 120 MW |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- INTRED-DC-CRETA (11 km, Intred SpA)
- INTRED-DC-TAMBURINI (14 km, Intred SpA)
- Poste Italiane Lombardy AI data center (24 km, Poste Italiane)
- Planetel (39 km, Planetel SPA)
- Aruba Global Cloud Data Center IT3 campus (42 km, Aruba S.p.A.)