TeraWulf Justified Data Campus (Project Raylan), Hawesville
TeraWulf Justified Data Campus (Project Raylan), Hawesville is a data center under construction in Hawesville, Kentucky, United States, operated by TeraWulf (Justified DataPower LLC / Raylan Data Holdings). The announced capacity at full build-out is 401 MW. The site is built for AI workloads.
Facts
| Operator | TeraWulf (Justified DataPower LLC / Raylan Data Holdings) |
|---|---|
| Status | Under construction |
| Address | 1627 State Route 3543, Hawesville, Hancock County, KY (former Century Aluminum smelter) |
| Location | Hawesville, Kentucky, United States |
| Power capacity | 401 MW |
| Expected | 2028 |
| AI focus | yes |
| Also known as | Project Raylan, Justified Data Campus |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Meade County Data Center (Brandenburg) (53 km, Undisclosed developer)
- SITCO Evansville (69 km, Sitco Business Solutions, LLC)
- Dynamics Mining (92 km)
- Heyburn Building (95 km, The Heyburn Building)
- PowerHouse Louisville Campus (Project Lincoln) (96 km, PowerHouse Data Centers / Poe Companies)
All data centers in United States