Switch The Pyramid Campus, Grand Rapids
Switch The Pyramid Campus, Grand Rapids is an operating data center in Gaines Township (Grand Rapids), Michigan, United States, operated by Switch. The stated power capacity is 320 MW.
Facts
| Operator | Switch |
|---|---|
| Status | Operating |
| Address | 6100 E Paris Ave SE, Grand Rapids, MI (former Steelcase Pyramid, Gaines Township) |
| Location | Gaines Township (Grand Rapids), Michigan, United States |
| Power capacity | 320 MW |
| Opened | 2017 |
| Investment | US$5 billion |
| Also known as | Switch Grand Rapids, SUPERNAP Pyramid |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- US Signal - Grand Rapids South (11 km, US Signal)
- 123.NET - DC4 - 400 76th St SW (11 km, 123.Net, LLC.)
- ManagedWay BYK1 (11 km, ManagedWay Company)
- Microsoft Lowell Township data center (Covenant Business Park) (15 km, Microsoft)
- Microsoft Dorr Township data center (20 km, Microsoft)
More Switch data centers
- Switch Citadel Campus (Tahoe Reno) Tahoe Reno Industrial Center, Storey County
- Switch Las Vegas Core Campus Las Vegas
- Switch Austin The Rock campus Round Rock
- Switch The KEEP Campus (Atlanta) Lithia Springs
- Switch Las Vegas 4 Las Vegas
- Switch KEEP 2.0 Atlanta North (Bartow County) Bartow County
- Switch Apex Industrial Park Campus North Las Vegas
- Switch Big Beaver Campus (Pittsburgh) Big Beaver Borough
All data centers in United States