ODATA BG03 Tenjo campus
ODATA BG03 Tenjo campus is a data center under construction in Tenjo, Colombia, operated by ODATA (Aligned Data Centers). The announced capacity at full build-out is 120 MW. The site is built for AI workloads.
Facts
| Operator | ODATA (Aligned Data Centers) |
|---|---|
| Status | Under construction |
| Address | Zona Franca Metropolitana, Tenjo, Cundinamarca |
| Location | Tenjo, Colombia |
| Power capacity | 120 MW |
| Expected | 2026 |
| AI focus | yes |
| Position accuracy | region level (approximate) |
Position accuracy: region level (approximate)
Nearby data centers
- Odata DC BG01 (8.5 km, ODATA COLOMBIA SAS)
- Cirion Bogota - BOG1 (13 km, Cirion)
- Cirion Bogota - BOG2 (15 km, Cirion)
- ODATA BG02 Mosquera (15 km, ODATA (Aligned Data Centers))
- KIO BOG1 Bogotá (17 km, KIO Data Centers)
More ODATA (Aligned Data Centers) data centers
- ODATA BG02 Mosquera Mosquera
- ODATA DC QR03 Campus El Marques
- ODATA ST02 San Bernardo San Bernardo
- ODATA ST01 Campus Lampa
- ODATA QR04 San Miguel de Allende San Miguel de Allende