Nvidia / Mega Or Mevo Carmel data center
Nvidia / Mega Or Mevo Carmel data center is a planned data center in Yokneam (Mevo Carmel industrial zone), Israel, operated by Mega DC (owner); Nvidia (operator, proposed). The announced capacity at full build-out is 64 MW. The site is built for AI workloads.
Facts
| Operator | Mega DC (owner); Nvidia (operator, proposed) |
|---|---|
| Status | Planned |
| Address | Mevo Carmel industrial zone |
| Location | Yokneam (Mevo Carmel industrial zone), Israel |
| Power capacity | 64 MW |
| AI focus | yes |
| Position accuracy | street level |
Nearby data centers
- Nvidia Israel-1 supercomputer data center Yokneam (5.5 km, Nvidia)
- Nvidia Kiryat Tivon campus (11 km, Nvidia)
- MedOne Tirat Carmel campus (TC1/TC2) (19 km, MedOne)
- MedOne TC1, TC2, TC3 (Tirat Carmel) (20 km, Med-1 IC-1 (1999) LTD.)
- Anan Afula data center campus (20 km, Anan Data Centers (Lian Group, Europe-Israel, PAI))