Microsoft Fairwater 2 Atlanta
Microsoft Fairwater 2 Atlanta is an operating data center in Atlanta area (Fulton County), Georgia, United States, operated by Microsoft. The stated power capacity is 350 MW. The site is built for AI workloads.
Facts
| Operator | Microsoft |
|---|---|
| Status | Operating |
| Address | Fulton County, GA (about 315 acres) |
| Location | Atlanta area (Fulton County), Georgia, United States |
| Power capacity | 350 MW |
| Opened | 2025 |
| AI focus | yes |
| Also known as | Fairwater Atlanta |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Lincoln Rackhouse Atlanta (3.2 km, Lincoln Rackhouse)
- Atlanta Tech Village (7.9 km, Performive)
- Colo@ (Buckhead) (8.9 km, Performive)
- Equinix AT4 - Atlanta (9.0 km, Equinix, Inc.)
- DC BLOX ATL1 - DCBLOX Atlanta (9.8 km, DC BLOX Parent LLC)
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Microsoft Fairwater Wisconsin Mount Pleasant
- Microsoft Pecos AI campus Pecos
- Microsoft Rockford Data Center (Monarch Rock Air site) Rockford
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Project Ginger East (DSM 14) West Des Moines
- Microsoft Rome Campus (Project Firecracker) Rome (Floyd County)
- Microsoft Columbus East / New Albany Campus New Albany
- Microsoft Fairwater Mount Pleasant campus Mount Pleasant
- Microsoft Goodyear Goodyear
- Microsoft Project Osmium United States
All data centers in United States