Menlo Digital MD-PX1 Phoenix Campus
Menlo Digital MD-PX1 Phoenix Campus is a data center under construction in Phoenix (Ahwatukee), Arizona, United States, operated by Menlo Digital (Menlo Equities). The announced capacity at full build-out is 257 MW.
Facts
| Operator | Menlo Digital (Menlo Equities) |
|---|---|
| Status | Under construction |
| Address | 4801 E Thistle Landing Dr, Phoenix, AZ 85044 |
| Location | Phoenix (Ahwatukee), Arizona, United States |
| Power capacity | 257 MW |
| Expected | 2026 |
| Position accuracy | street level |