Keel Infrastructure Panther Creek Campus
Keel Infrastructure Panther Creek Campus is a data center under construction in Nesquehoning, Pennsylvania, United States, operated by Keel Infrastructure (formerly Bitfarms). The announced capacity at full build-out is 350 MW, of which 60 MW are in operation. The site is built for AI workloads.
Facts
| Operator | Keel Infrastructure (formerly Bitfarms) |
|---|---|
| Status | Under construction |
| Address | Panther Creek site, Carbon County (336 acres) |
| Location | Nesquehoning, Pennsylvania, United States |
| Power capacity | 350 MW |
| Power in operation | 60 MW |
| Expected | 2027 |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Project Hazelnut (Hazle Township) (23 km, NorthPoint Development)
- AWS Berwick (37 km, Amazon)
- Nautilus Cryptomine (37 km)
- Edged Project Atlas (38 km, Edged)
- PDC1 - 9999 Hamilton blvd (38 km, Colocation America Corporation)
All data centers in United States