GDS (DayOne) Shaoguan Computing Cluster Phase 2
GDS (DayOne) Shaoguan Computing Cluster Phase 2 is a planned data center in Shaoguan, China, operated by GDS Holdings. The announced capacity at full build-out is 1.7 MW.
Facts
| Operator | GDS Holdings |
|---|---|
| Status | Planned |
| Location | Shaoguan, China |
| Power capacity | 1.7 MW |
| Expected | 2028 |
| Position accuracy | region level (approximate) |
Position accuracy: region level (approximate)
Nearby data centers
- Alibaba Cloud and China Telecom Shaoguan Zhenwu AI Data Center (0.0 km, China Telecom)
- Chindata and HEC Shaoguan AI Campus (0.0 km, Chindata Group / HEC)
- China Mobile GHM Shaoguan Data Center (0.0 km, China Mobile)
- 信息中心 (20 km, 韶关市职业综合高级中学)
- Tencent Qingyuan Data Center Cluster (149 km, Tencent)
More GDS Holdings data centers
- GDS Beijing Daxing Campus (BJ5) Daxing District, Beijing
- GDS Zhangbei Wanguo Campus Zhangbei County, Zhangjiakou
- GDS Chengdu Campus (CD1-CD2) Chengdu
- GDS Shenzhen Campus (SZ1-SZ5) Shenzhen
- GDS Langfang Xianghe Campus Xianghe, Langfang
- GDS Shanghai Waigaoqiao (SH1) and Shanghai campuses Shanghai
- GDS Kunshan Campus (KS1-KS3) Kunshan
- GDS Guangzhou Huangpu and Nansha Campuses Guangzhou