EDGNEX Cikarang AI Campus
EDGNEX Cikarang AI Campus is a data center under construction in Cikarang, Indonesia, operated by EDGNEX (DAMAC). The announced capacity at full build-out is 144 MW. The site is built for AI workloads.
Facts
| Operator | EDGNEX (DAMAC) |
|---|---|
| Status | Under construction |
| Address | Jalan GIIC Boulevard, Greenland International Industrial Center, Cikarang, Bekasi |
| Location | Cikarang, Indonesia |
| Power capacity | 144 MW |
| Expected | 2026 |
| Investment | US$2.3 billion |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)