EDC One data center (Pego)
EDC One data center (Pego) is a planned data center in Abrantes, Portugal, operated by EDC One. The announced capacity at full build-out is 800 MW.
Facts
| Operator | EDC One |
|---|---|
| Status | Planned |
| Address | Former RPP Solar land next to Pego power plant, Pego, Abrantes |
| Location | Abrantes, Portugal |
| Power capacity | 800 MW |
| Expected | 2028 |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Hyperion Renewables data center (Pego) (0.0 km, Hyperion Renewables Services)
- Data Center IPT (22 km)
- MERLIN Edged Lisbon AI Campus (LIS01-LIS05) (84 km, MERLIN Properties / Edged Energy)
- NxN Data Centers Evora (102 km, NxN Data Centers)
- Data Center Portugal Telecom da Covilhã (108 km, Portugal Telecom)