DayOne Imari Data Center Campus
DayOne Imari Data Center Campus is a planned data center in Imari, Japan, operated by DayOne. The announced capacity at full build-out is 200 MW. The site is built for AI workloads.
Facts
| Operator | DayOne |
|---|---|
| Status | Planned |
| Address | Imari East Industrial Park, Imari City, Saga Prefecture |
| Location | Imari, Japan |
| Power capacity | 200 MW |
| Expected | 2030 |
| Floor area | 133,000 m² |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- APL Itoshima Data Center Campus (44 km, Asia Pacific Land (APL))
- KDDI (60 km)
- NTT Fukuoka Tenjin Data Center (60 km, NTT SmartConnect Corporation)
- QTnet Fukuoka Data Center 3(QD3) (60 km, QTnet, Inc.)
- AT TOKYO (QC1 QTnet Fukuoka(QD3)) (60 km, AT TOKYO Corporation)
More DayOne data centers
- DayOne Nurmijärvi Campus (Klaukkala) Nurmijärvi
- DayOne Kabil Industrial Tech Park Campus (Batam) Batam
- DayOne Chonburi Tech Park CTP1 Chonburi
- DayOne Lahti Campus (TikTok) Lahti
- DayOne Nongsa Digital Park (Batam) Batam
- DayOne Singapore (Jalan Buroh) Singapore
- DayOne HK1 Kwai Chung
- DayOne HK2 and HK4 (Kwai Chung / Shek Lei) Kwai Chung
- DayOne Kempas Tech Park Campus Johor Bahru
- DayOne Selangor Sites (Kapar) Kapar
- DayOne Nusajaya (Johor) Nusajaya (Iskandar Puteri)