Dane County Data Exchange 2 (DCDE II)
Dane County Data Exchange 2 (DCDE II) is a planned data center in Madison, Wisconsin, United States, operated by Dane County Data Exchange LLC. The announced capacity at full build-out is 60 MW. The site is built for AI workloads.
Facts
| Operator | Dane County Data Exchange LLC |
|---|---|
| Status | Planned |
| Address | 3351 Dairy Dr, Madison, WI 53716 |
| Location | Madison, Wisconsin, United States |
| Power capacity | 60 MW |
| AI focus | yes |
| Also known as | DCDE II |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- EdgeConneX Madison (EDCMAD01) (0.2 km, EdgeConneX Inc.)
- Network 222 (7.8 km, Fiore Companies)
- 5Nines Data (7.8 km, 5Nines Data / Network222)
- 612 W Main (8.1 km, Hoyos Consulting LLC)
- University of Wisconsin-Madison (9.3 km, University of Wisconsin-Madison)
All data centers in United States