Damac Digital MIL01 (Pregnana Milanese)
Damac Digital MIL01 (Pregnana Milanese) is a planned data center in Pregnana Milanese, Italy, operated by Damac Digital. The announced capacity at full build-out is 200 MW.
Facts
| Operator | Damac Digital |
|---|---|
| Status | Planned |
| Address | Former Gefco-Citroen factory site, Pregnana Milanese (MI) |
| Location | Pregnana Milanese, Italy |
| Power capacity | 200 MW |
| Expected | 2028 |
| Floor area | 55,000 m² |
| Also known as | MIL01 |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- AiOnX Pregnana Innovation Campus (0.0 km, AiOnX (SWI Group))
- Data4 Milan MIL01 campus (Cornaredo) (2.1 km, Data4)
- DATA4 Milan-Cornaredo - MIL1 (4.3 km, DATA4 s.a r.l)
- Vaultica MIL03 (Settimo Milanese) (4.7 km, Vaultica)
- Equinix Settimo Milanese campus (ML5, ML7x, ML8, ML9x) (5.1 km, Equinix)