ClusterPower Mischii campus (Craiova)
ClusterPower Mischii campus (Craiova) is an operating data center in Mischii, Romania, operated by ClusterPower. The stated power capacity is 512 MW, of which 10 MW are in operation. The site is built for AI workloads.
Facts
| Operator | ClusterPower |
|---|---|
| Status | Operating |
| Address | Mischii, Dolj County, about 230 km west of Bucharest |
| Location | Mischii, Romania |
| Power capacity | 512 MW |
| Power in operation | 10 MW |
| AI focus | yes |
| Position accuracy | city level (approximate) |
Position accuracy: city level (approximate)
Nearby data centers
- Tier Datacenter (12 km, S.C. TIER S.R.L)
- Digi (RCS & RDS) Craiova (12 km, Digi România SA)
- PANOURI SOLARE REDEA DATACENTER (52 km)
- ORANGE STORE (88 km)
- DROBETA DATACENTER (97 km, DATA ZYX SRL)