BUZZ HPC GTA AI Gigafactory
BUZZ HPC GTA AI Gigafactory is a planned data center in Greater Toronto Area, Canada, operated by BUZZ HPC (HIVE Digital Technologies). The announced capacity at full build-out is 320 MW. The site is built for AI workloads.
Facts
| Operator | BUZZ HPC (HIVE Digital Technologies) |
|---|---|
| Status | Planned |
| Address | Contiguous site of about 21 acres plus 4-acre parcel in GTA |
| Location | Greater Toronto Area, Canada |
| Power capacity | 320 MW |
| Expected | 2027 |
| AI focus | yes |
| Position accuracy | region level (approximate) |
Position accuracy: region level (approximate)
Nearby data centers
- QScale Ontario AI Data Centre (proposed) (0.0 km, QScale)
- Digital Realty YYZ10 Markham (6.3 km, Digital Realty)
- Centersquare Toronto (YYZ2) (8.0 km, Centersquare)
- Equinix TR5 - Toronto (8.0 km, Equinix, Inc.)
- Cyxtera Toronto YYZ2 (8.1 km, Cyxtera)