Albania Data Center ADC TEDA Tirana is a data center under construction in Tirana, Albania, operated by ADC (Happy Technologies 80 percent, DIT 20 percent). The announced capacity at full build-out is 100 MW. The site is built for AI workloads.
Facts
| Operator | ADC (Happy Technologies 80 percent, DIT 20 percent) |
|---|---|
| Status | Under construction |
| Address | TEDA free trade zone, west of Tirana; 4.5 acres of government land |
| Location | Tirana, Albania |
| Power capacity | 100 MW |
| Expected | 2028 |
| AI focus | yes |
| Position accuracy | region level (approximate) |